rodriguezoziel925
rodriguezoziel925 rodriguezoziel925
  • 12-10-2022
  • Mathematics
contestada

A contractor hired 150 workers to pave 30 miles of highway how many workers will they need to hire to pave 20 miles of highway in the same amount of time?

Respuesta :

Otras preguntas

Multiply (4.12 × 10−9)(8.3 × 1015). write the final answer in scientific notation. 34.196 × 10−134 3.4196 × 107 3.4196 × 10−135 34.196 × 106
Pepe y Celia _____ estudiar. A. necesitamos B. necesita C. necesitan D. necesitas
Suppose there is a drop in temperature for every thousand feet that an airplane climbs into the sky. If the temperature on the ground is ​, what will be the tem
A girl rides her bike at 18 m/s for 31 s. How far does she travel in that time
A rock is thrown downward at an initial velocity of 20m/s from a 40 meter tall building, what will be its final velocity before hitting the ground?
List the file POLITICAL, ECONOMIC and SOCIAL hurdles The US had to over come during reconstrucción
There are three major focus areas to the HIPAA legislation. They are: A. Confidentiality, Safeguards, Reasonable Effort B. Policies, Procedures, Regulations C.
Identify the structures in the cell pictured on the right. Label A Label B Label C m Label D Label E help pls
Solve. ⎧⎩⎨⎪⎪2x−y+2z=−6−3y+z=−22x−3z=4 Enter your answer, in the form (x,y,z), in the boxes in simplest terms.
What’s the answer?????????????????????????????