jordonmorris42
jordonmorris42 jordonmorris42
  • 12-11-2022
  • Business
contestada

The current state Lead Time is 362 hours. In the future state, the
lead time has reduced to 100 hours. Calculate the % improvement
in the lead time.
A 27.62%
B 127.62%
C 362.00%
D 72.38%

Respuesta :

Otras preguntas

Ophelia is making homemade spaghetti sauce by combining 48 oz of tomato paste with 6 cups of water.how many ounces of tomatoes paste are needed for every cup of
5. For the speaker in this circuit, the voltage across it is always proportional to the current through it. Find the maximum amount of power that the circuit ca
What are the coordinates of the image of L for a dilation with center (0, 0) and scale factor ?
A collection of quarters and dimes has a total value of$5.00 and contains 32 coins. How many of each kind of coins are there in the collection?
please help. i need this done today
what is 8/9 divided 2/3
Fictional Corp makes use of ITIL processes and lifecycle management strategies to ensure that they have a good handle on the various stages of creating new appl
Select all the correct answers. Jodie is writing a report on health insurance in the United States. As a reference, she’s using an online report on the extent o
DEFINITION of COMPONENT HARDWARE?
Which of the following statements reflect the philosophy of the classical school