Opty5551 Opty5551
  • 13-12-2022
  • Engineering
contestada

The operations manager of a body and paint shop has five cars to schedule for repair. He would like to minimize the throughput time (makespan) to complete all work on these cars. Each car requires body work prior to painting. The estimates of the times required to do the body and paint work on each are as follows:

Respuesta :

Otras preguntas

$2.95 notebooks; 5% tax
In a factory that manufactures tires, a machine responsible for molding the tire has a failure rate of 0.2%. If 1,000 tires are produced in a day, of which 6 ar
What is the main purpose of the Executive Branch? A. determine the law B. interpret the law C. enforce the law D. create the law
how do you say yes in Germany
What impact did the marriage of Eleanor of Aquitaine to Henry II have on England? It strengthened England because Eleanor joined her lands in France with those
Which best explains why Britain restricted trade with the colonies? to restrict access to Britain’s goods as punishment to ensure that trade generated taxes for
what is a synonym for realised
Unlike previous federal policies, President Grants "peace policy" attempted to? A:Relocate with settlers to the East B:Provide fair and kind treatment to the tr
What does 64/100 represent as a ratio and a percent
76255 divided by 309