duckyduck1014 duckyduck1014
  • 15-05-2023
  • Business
contestada

Which of the following types of control plans is particular to a specific process or subsystem, rather than
related to the timing of its occurrence?
a. Preventive.
b. Corrective.
c. Application.
d. Detective.

Respuesta :

Otras preguntas

A tenured college professor may rank high in prestige, but relatively low in income. What might one predict about her political views
I need some help on this :)
Solve the absolute inequality: |4x-5| >3
help Based on the information from the passage, the reader can best conclude that the narrator will A start thinking he’s a dog. B get out of the scan room.
I dare you to answer this ,’:) I’m serious just help me already
Write an algorithm and draw a flowchart to convert the length in feet to centimeter
adventitious storage roots are seen ina)Carrot b)Sweet potatoc) Turnie d)Radish​
This the right one click it so you can get it right
HELPPPPPPPPPP Read the following: "Almost no one can resist looking at an electronic screen before bedtime. A survey by the National Sleep Foundation says that
will give brainliest no files.