AnnaValentine3414 AnnaValentine3414
  • 11-01-2024
  • Law
contestada

I am the residential original contractor and I provide labor and materials for the project. Who do I need to give a notice of Right to Lien to?

A) The project architect
B) Subcontractors on the project
C) The property owner
D) Local building inspectors

Respuesta :

Otras preguntas

What properties make it suitable to be used for supportive frames
A student believes that they have a learning disability. What type of psychologist should you refer them to for testing?
What equation represents a line that passes through(4,1/3) and has a slope of 3/4?
Errorless learning typically uses: a) More verbal prompts than other types of discrete trial instruction b) Least to most prompt sequences c) Only hand over
The price of a litre of petrol is increased from C30.00 to C 39.00.What is the percentage increase in the cost of a litre of petrol ?​
Please help!!! Very simple 5 or 6 steps to how we can carry out the osmosis required practical
How does the suns energy transfer to the Earth?
Seven less than six times a number k
A 4000 kg elevator rises from the basement to the top of a100-m tall building. Which of the following is closest to the network done on the elevator as it rises
how does scientific notation work