Which option predicts what the power generation model will look like in the following scenario?
A. team of engineers is designing a nuclear power plant that will stand five stories high. they need to create a model of the power plant to submit to the government for approval. the model response will be a functional replica to ensure that no details are missed from such an important project.
B. the model will be a functional replica to ensure no details are left out of the important project. the model will be smaller but does not need to be drawn to scale at this stage of the design.
C. the model must be a fully functional replica, but at this time the model does not need to have exact proportions.
D. this model will be developed on a smaller scale because it would be too large and expensive to design at full size.