BabyBlu2248 BabyBlu2248
  • 14-02-2024
  • Engineering
contestada

No NOTAM action is required for radar systems (PAR, ASR, etc.) that are a part of the National Airspace System if the time periods do not exceed ____.
a) 12 hours
b) 24 hours
c) 48 hours
d) 72 hours

Respuesta :

Otras preguntas

Most of the southern united states was explored by the _______.
Which is a characteristic of a Lewis base
Is the blue whale known as a fish?
What is the relationship between a stimulus and a response?
It is possible to determine the molecular weight of a compound from its molecular formula. true or false.
Which lines in wordsworth's lyric poem "the solitary reaper" present the reaper's song as more beautiful than nature?1.) behold her, single in the field,yon sol
Is a grasshopper a consumer or producer
41,000 rounded to the nearest 10,000
School starts in August. is this a sentence or fragment
which of the symptoms below require you to stop working and go home? a) swollen glands b) hives or skin rash c) coughing and sneezing d) soar throats and fever