Crull4073 Crull4073
  • 11-03-2024
  • Mathematics
contestada

Cp/Cpk. To achieve the optimal Cp value of 1.33, one would have to have \pm 4 sigma between thespecification limits, a total of 8 sigma. For six sigma companies, to achieve the optimal Cp valueof 2.00, the process would need to have 12 sigma between the specification limits.
(a) True
(b) False

Respuesta :

Otras preguntas

what is the capital of the island nation off the southeast coast of India
what is the name of the large island body of water bordered by Iran, azerbaijan, russia, kazakhstan, and Turkmenistan
what is crossing a hybrid with a homozygous dominant or a homozygous recessive organism resulting in a 1:1 ratio called?
What is 3/10 equivalent to
If water and ethanol both have all 3 intermolecular bonds, why does ethanol evaporate so much quicker?
How to draw a model to prove that 3/10 is equal to 9/30
Find the unit rate in feet per second 300 yards over 1 minute
Suppose that as the result of extensive pollution to the ocean, kelp forests are killed. Explain how this would affect not only kelp populations, but also many
How can I change 19/4 in a mixed number
Compare the element hydrogen with the alkali metal sodium