When inspecting the completed installation of resilient flooring, what kinds of things should be confirmed before signing off on the installation? Please make your answers detailed.
a) Adequate adhesive coverage
b) Proper seam alignment and integrity
c) Correct subfloor preparation
d) Absence of defects or damage in flooring material
e) Proper finishing and edge treatments