4. What aspect of the initial database planning process would the formula (0 + Pt × 3 + p)/5 be used in?

A. Time estimation
B. Budgeting
C. Workforce forecasting
D. Entity prediction

Respuesta :

becky71405
becky71405 becky71405
  • 15-01-2019
Time estimation makes the most since in this scenario
Answer Link

Otras preguntas

Describe the composition and the main parts of a comet.​
median mark of 3,2,0,1,9,12,3,5​
how does a cookie work?
In a right triangle, a and b are the lengths of the legs and c is the length of the hypotenuse. If a=21 miles and c=75 miles, what is b? If necessary, round to
The total interest on a discounted loan is $80. If James received $880 into his bank account on drawdown, and the loan lasts for 6 months, what is the (simple)
This is part of Slaughterhouse Five What does Billy uncontrollably do that requires him to take a nap every day? Why? Select one: a. Billy shakes uncontrollabl
How many cubic meters are in 122047.5 cubic inches (with formula please)​
A college's football team will play 16 games next fall. Each game can result in one of 2 outcomes: a win or a loss. Find the total possible number of outcomes f
The graph shows the velocity f(t) of a runner during a certain time interval: Graph of line segment going through ordered pairs 0, 2 and 6, 8. Graph of another
what is the slope for (3, 8) and (2, 6). ?