sash11
sash11 sash11
  • 15-06-2019
  • Mathematics
contestada

If it takes 6 men 4 days to dig a hole 3 metres deep, how long will it take
10 men to dig a hole 7 metres deep?​

Respuesta :

Аноним Аноним
  • 15-06-2019

Answer:

I think the picture here explains you everything

hope this helped

Ver imagen Аноним
Answer Link
jasminreveles000 jasminreveles000
  • 25-02-2021

Answer:

8 days

Step-by-step explanation:

Answer Link

Otras preguntas

Which phrase best describes an epic?
Yumi picks up litter for 3 miles and takes two hours longer than juan, who picks up litter for 2 miles. if it took juan x hours, how long did it take yumi?
What is the main goal of zume pizza??
What is 4.438 rounded to the nearest tenth?
How many yards in 27 feet?
A squirrel collect 72 acorn per day. how many will 4 family of 6 will gather
This is a mathematical sentence written with a greater than, a less than sign, or a not equal to sign.
How does one do math?
What is the smallest blood vessel in the circulatory system? A. capillary B. vein C. artery D. platelet
what major political party was born out of the slavery issue?