OdalquisRamirez
OdalquisRamirez OdalquisRamirez
  • 13-09-2019
  • Mathematics
contestada

On a construction project, poured concrete is given 1,000 hours to dry completely.
What is the result when this time is converted into days?
Use 24 hours = 1 day.
Enter your answer in the boxes.
days,
hours

Respuesta :

NathanCrews75
NathanCrews75 NathanCrews75
  • 13-09-2019

Answer:

41.6 days.

Step-by-step explanation:

1000 divided by 24 is 41.6 repeating

Answer Link

Otras preguntas

why do we still study edmund burke?
what biomolecules are found in all organisms?
if JL=17 and KL=15 what is JK and JM?
Which of the following should replace the question mark in this diagram
Which was an achievement of the Byzantine Empire?
What limited democracy in the independent nations of latin america?
Help with this please.
u have 10 batteries sitting on your desk, three of which are dead. You choose 2 batteries are random for you calculator. What is the expected number of good bat
Which symbol is used to identify edge-triggered flip-flops? a triangle on the clock input. the letter e on the enable input. a bubble on the clock input. an inv
Which of these resources has caused the most conflict in Africa in the years since World War II? A) oil and lumber B) coal and copper C) natural gas and oil