hghgvccom hghgvccom
  • 11-09-2020
  • Business
contestada

The Three Common Constraints on a Project are Scope, Budget and Time.
Ο Τ.
T True
O F.
False

Respuesta :

mjamesbond2016
mjamesbond2016 mjamesbond2016
  • 11-09-2020

Answer:

true

Explanation:

Scope, budget and time are part of the triple constraint theory aka the Iron triangle in management

Answer Link

Otras preguntas

Identify the initial amount a and the growth factor b in the exponential function a(x)=30 * 8.3^x
Two plant species found in a dry region of the western United States exhibit vastly different abilities to survive. Species A has very slow stem growth and few
Simplify the expression 48^1/2
What is 76.58 plus 24.3 equallys to what? Please explain how you added and got your answer
How much volume would 2.00 moles of gas take up, under standard temperature and pressure conditions? 11.2 L 22.4 L 33.6 L 44.8 L
you got a ride to a footbal game with some friends as it is time to go home you realize that the driver has been drinknig alcohol. name three steps you can take
Why did it take the states so long to ratify the Articles of Confederation?
Robert is playing a game of cards with his family. If he randomly picks a card from a standard 52-card deck, the probability of drawing a heart on the first dra
In a bakery shop, the ratio of cakes to cookies baked in a day is 3:5. Which of the following best describes the number of cakes to the number of cookies baked
what is human right violance