sumeirahaseen28 sumeirahaseen28
  • 14-02-2021
  • Chemistry
contestada

Calculate the amount of work done in lifting a heavy load of 50kg up to the height of 3m?

Respuesta :

laisianaturaga
laisianaturaga laisianaturaga
  • 14-02-2021

amount of work done is equal to l/h

so 50/3=16.66667

round your ans to 2 significant figure

so your ans will be 17m/kg

Answer Link
jess9442 jess9442
  • 14-02-2021
have to find the lift which would be 50kg times 9.8N/kg which would give you 490N. the formula for work is force times distance. so 490N times 3m= 1470J
Answer Link

Otras preguntas

Josh believes the Spanish club students at his school have an unfair advantage in being assigned to the Spanish class they request. He asked 500 students at his
Jana bought a car for $4200 and later sold it for a 30% profit. How much did Jana sell the car for?
Describe the way nocturnal animals move using ing starters
which geographic factor was most significant in helping the soviet union withstand German attacks in world war II
Find the speed in degrees per minute of the minute hand of an accurate a clock.
Jana bought a car for $4200 and later sold it for a 30% profit. How much did Jana sell the car for?
is freshwater drum a consumer
Angle 1 and angle 2 are a linear pair. Measure of angle 1 = x-36, and measure of angle 2 = x+84. Find the measure of each angle.
???????????? Can I has h
How to say I'm eating in german