It takes one week for a crew of workers to pave 3/5 kilometer of a road. At that rate, how long will it take to pave 1 kilometer?

Respuesta :

ayfat23
ayfat23 ayfat23
  • 12-03-2021

Answer:

1.67 weeks

Step-by-step explanation:

Let X= time it will take to pave 1 kilometer?

1 week=3/5 kilometer

X week =1 kilometer

Cross multiply

3/5 X= 1

3X= 5

X= 5/3

1.67 weeks

Answer Link

Otras preguntas

How a cloned flock would be different from a noncloned flock
A toy company produces two kites whose shapes are geometrically similar. Find the length of the missing side of the smaller kite
Compare the element hydrogen with the alkali metal sodium
the pet store sells bags of pet food. there are 4 bags of cat food. one sixth of the bags of food are bags of cat food. how many bags of pet food does the pet s
Steve has 120 feet of fence to make a rectangular kennel for his dogs. He will use his house as one side. Write an algebraic expression for the kennel's length.
What is 3/10 equivalent to
Consider the equation 5x+7=22 What two operations are represented in this equation?? How would you "undo" each of those operations Which operation should you "
Suppose a magnetic reversal accoured today . How would new rocks at mid ocean ridges differ from rocks that formed last year
Applewood Elementary boasts a student to teacher ratio of 14 : 1. What percent of the school makes up the number of teachers at Applewood Elementary? (Round pe
What does como se dice mean?