daligdigjaidely40881 daligdigjaidely40881
  • 11-06-2021
  • Business
contestada

The total overhead variance is the difference between actual overhead costs and overhead costs applied to work done.
a) true
b) false

Respuesta :

GIMMESLEEP
GIMMESLEEP GIMMESLEEP
  • 11-06-2021
The total overhead variance is the difference between actual overhead cost and overhead cost applied to work done is True
Answer Link

Otras preguntas

the recode for the Boston marathon wheelchair division is 1 hour 18 minutes and 27 seconds
Can someone answer the Math Question ASAP i will mark brainliest
If an archer fires an arrow horizontally from a cliff that is 5 meters high. Draw the trajectory of the arrow. Label. Label the cliff, Voy, Vfy, Vox, Vfx, Dx an
What is the mass of oxygen?​
4) A deadly pesticide toxin entered in the ocean via rainwater runoff. This toxin killed off many of the diatoms (phytoplankton) of the Antarctic area. What wil
Find the equation of the exponential function represented by the table below: x 0 1 2 3 Y 5 2.5 1.25 0.625
Instruction Active Identifying Components of a Formula What are the components that could be used in a mathematical formula? Check all that apply. Ovariable exp
Some objects, like the skateboarder, have energy as a result of their positions. Energy in this state is stored. 5. How does gravity have the potential to exert
Light has a frequency of 7.21 * 10 ^ 13 hertz. What is its wavelength ?
Use a unit circle, a 30°-60°-90° triangle, and an inverse function to find the degree measure of each angle. angle whose sine is 1