sammy5000
sammy5000 sammy5000
  • 13-12-2016
  • Mathematics
contestada

Recycling Center A processes aluminum at a rate of 100 pounds per hour, while Recycling Center B processes aluminum at a rate of 2 tons per week. Assuming that both centers operate all day every day, which center processes aluminum faster, and why?

Respuesta :

21SAVAGEEE
21SAVAGEEE 21SAVAGEEE
  • 13-12-2016
I believe it is Recycling center A
Answer Link
Brenan
Brenan Brenan
  • 13-12-2016
I think it's A aswell.
Answer Link

Otras preguntas

what does carbon dioxide do vary slightly in the portion from day to day as well as from place to place
What is the slope of the line? a.0 b.1 c.undefined d.infinity
Simplify: 8u2 ‒ 42u2
what is 1 whole minus 6/9
What port city handles the largest amount of international sea trade in the United States?
Imagery, Figurative Language of the hobbit
Construct a scatter diagram using the data table to the right. This data is from a study comparing the amount of tar and carbon monoxide​ (CO) in cigarettes. Us
Find the product. OF -4x(8 + 3x) -20x -44x -32x - 12x^2 -32x + 12x^2
Why is small surface area important in a cell
Which of the following best describes the solution to the system of equations below? 7x + 4y = 8 7x + 4y = 13 A. The system of equations has exactly one solu