abelmulugeta19 abelmulugeta19
  • 11-10-2021
  • Computers and Technology
contestada

consider 4 jobs arriving in ready queue in the same order at time =0 if BT requirements of these jobs are 4,1,8,1 respectively what is completion time of p1 assuming round robin with TQ =1

Respuesta :

marietavukadinovic marietavukadinovic
  • 11-10-2021

Answer:tq we

Explanation:

t rhh

Answer Link

Otras preguntas

what is a creation myth
What danger do the strikes face
What is another name for several small utility programs that are found in the control panel?
What is the correct answer for this?
sandra calculated the missing side of one of these three triangles using the pythagrean therom which triangle is it
Georgia is a coffee enthusiast and drinks three coffee drinks a day from a local coffee shop costing $1.25 each. Being concerned with the expense of her coffee
15 POINTS Identify the center and radius of a circle with equation (x-4)^2 + (Y+2)^2 =9 A.) Center at (4,2); radius: 9 B.) Center at (-4,2); radius: 9 C.) Cent
help me please thank you​
please it’s not hardHow many points are contained on a line? infinitely many 20.000 none
A. where will vertex A be located after a rotation of -90° B. where will vertex B be located after a rotation of 90° C. where will vertex C be located after a