jilliangracee7871 jilliangracee7871
  • 12-11-2021
  • Business
contestada

The​ ________ tells managers how much of the overall variance is due to paying a higher or lower price than expected for the quantity of materials it purchased.

Respuesta :

pwcm6g8g4b
pwcm6g8g4b pwcm6g8g4b
  • 12-11-2021
Direct labor rate variance
Answer Link

Otras preguntas

what is 1,722 divided by 13
how to factor 5a^4 + 12a^3 + 4a^2
What is 6,333 rounded to the nearest thousand
What is the traditional symbol of judaism
According to John Locke, why did people create a government
Which conjunction best fixes the run-on sentence? Can Michelle climb the rock wall, __________ can I, too? a. nor b. so c. or d. and
How many solutions does the equation have? 4x 1=5 2(2x-4)
755,082 round to nearest ten thousand
Which is a true statement? a. –4.28 > –3.56 b. 5.7 < 5.63 c. –4.37 < –1.63 d. –13.9 > 4.63
Why do people study history? Choose all answers that are correct. A. It demonstrates how people will live in the future. B. It explains why our culture is sup