jpohlig
jpohlig jpohlig
  • 12-01-2017
  • Business
contestada

A construction consultant may be responsible for
A. performing building code inspections.
B. overseeing contractors and releasing payments.
C. purchasing construction materials.
D. assisting with the design of house plans.

Respuesta :

Аноним Аноним
  • 12-01-2017
D. assisting with the design of house plans.
Answer Link
britneynav13
britneynav13 britneynav13
  • 20-04-2021

Answer:

d the person on top is right

Explanation:

Answer Link

Otras preguntas

What is the next number in the pattern 0.4, 1.6, 6.4, 25.6, ?
You lift a 45-newton bag of mulch 1.2 meters and carry it a distance of 10 meters to the garden. How much  work was done?
My daugher is trying to Solve -7.8x=-1.56
The sum of three consecutive even numbers is 156. What is the smallest of the three numbers
When you divide a whole number by a whole number( other then one), the quotient is a smaller number?
What is the next number in the pattern 0.4, 1.6, 6.4, 25.6, ?
Katie cut out a piece of wrapping paper that was 2 times as long and 3times as wide as the box that she was wrapping.The box was 5 inches long and 4 inches wide
what is a complex set of responses
How to solve. -3(4r-8)= -36
Is 119 a prime or composite number? If is composite, what prime numbers are factors of 119?