ANAi3tzenaawe1stor ANAi3tzenaawe1stor
  • 16-01-2017
  • Mathematics
contestada

A construction crew has just built a new road. it took them 7 weeks to build 8.75 kilometers of road. at what rate did they build the road?

Respuesta :

Аноним Аноним
  • 16-01-2017
7 weeks = 8.75

1 week = x

where x is the kilometers of road built in a week

Proportion:

8.75/7 = x/1

7x=8.75

x=1.25
Answer Link

Otras preguntas

the goal of the sepoy rebellion was to __________
Why does ponyboy collapse the night of the rumble in the outsiders?
d(1)=3 d(n) = d(n-1) - 14 what is the third term in the sequence
States might choose to cooperate at the regional or global level for all of the following reasons EXCEPT To gain regional political influence To engage in disp
How many Americans served in the front by the end of the war and how many died in World War I
Which presidential candidate ran against george w. bush in 2004?
Which mental health issues can nicotine addiction lead to? Check all that apply. A.anger B.headaches C.anxiety D.mood swings E.depression
Which phrase is the best definition of culture? the beliefs, attitudes, values and practices of a community of individuals?
The latitude of a place affects climate because an area’s location determines how much __________ it receives. A. rain B. humidity C. sun D. wind      Please se
What was the goal of impressionist painters? A to capture the eye's first impression of a scene B to give readers a sense of unchanging reality C to portray the