corinthianshanyqua10 corinthianshanyqua10
  • 13-05-2022
  • Mathematics
contestada

A construction firm is building a football stadium. The building work has taken 499 days so far. It should take another 199 days to build. How many days will the building work take in total

Respuesta :

thompmk
thompmk thompmk
  • 13-05-2022

499

199

+-------  the answer is 698 you have to add 499 and 199.

Answer Link

Otras preguntas

How do I solve 6^x=216?
What was the response of Congress toward Lincoln's Reconstruction plan of forgive and forget? It passed the Johnson-Sherman bill. Congress tried to impeach Linc
Write a proportion that you can use to convert 60 inches to centimeters.
Is it true that when an object is seen moving in relation to a stationary object the stationary object is called the frame of reference or reference point?
If an airplane is traveling at 500 mph and a fly is flying forward inside the airplane is the fly traveling faster than the airplane?
Maintaining order in society is an example of __________. A. providing for the common defense B. establishing justice C. insuring domestic tranquility D. promot
Why do O2 and CO2 pass through the plasma membrane?
What did the British develop to prepare for German Air Attack?
Why do O2 and CO2 pass through the plasma membrane?
The frozen jogurt shop uses 1 pint of milk in each milkshake how many milkshakes can be made whit 24 quarts of milk? Help me plz