nkazmirski1458 nkazmirski1458
  • 11-02-2018
  • Mathematics
contestada

Suppose that it takes 4 hours of labor time to paint a room and 4 hours to sand a floor. if two workers each spend 12 hours painting. if a decision was made to only sand floors , how many floors could be sanded?

Respuesta :

lizzyplunkett60
lizzyplunkett60 lizzyplunkett60
  • 12-02-2018
It would be three floors because 4x3= 12
Answer Link

Otras preguntas

Which of the following phrases is an infinitive phrase? O A. kicked the can B. through the alley c. to hit the ball correctly O D. kicking the can
Find the inverse of the function. y=3x–5
What is the measure of ZC 42 48 90 180
Although army platoons were segregated, how did the army play a significant role in race relations?
i need help please thanks​
Answer to the Brainpop solar system
How long does it take an airplane flying at a speed of 600 miles per hour to fly 3,000 miles? 0.2 hours 0.5 hours 2 hours 5 hours
what do you like the most about yourself even though you guys are amazing and probably have so much too like
How do you say “ The genetic traits are in everything” in Spanish
Help! I don’t understand