revillaengelbep76mcy revillaengelbep76mcy
  • 14-04-2018
  • Mathematics
contestada

sí 8 trabajadores tardan 5 días en hacer una obra, cuánto tardarán si son 16 trabajadores, Y si son 4 trabajadores. proporcionalidad

Respuesta :

amendocrr amendocrr
  • 14-04-2018
si son 16 trabajadores serian 10 días porque 8 es la mitad de 16 y si fueran 4 trabajadores seria 2.5 días 

Answer Link

Otras preguntas

The helping verbs and the main verb can be together or interrupted by other words (another word put between them). Find the helping verb and main verb in the fo
For a C3-C5 emergency/oral prescription, when should you receive a follow-up prescription by? A. Within 7 days B. Within 14 days C. Within 21 days D. Within 30
What does constitutional home rule allow that other forms of home rule do not allow?
Find the measure of ALL sides. Leave in reduced radical form.
What are prenatal vitamins typically used for in the early stage of pregnancy?
What animal is common in this area and may cross the road during twilight and nighttime hours? 1) Deer 2) Rabbit 3) Fox 4) Squirrel
Select the true statements describing why cladistics may not always be the best method for reconstructing phylogenies based on data from the DNA genome.A- The r
What positioning adaptation is made for the AP projection of the pelvis and hips if trauma is an indication?
A patient has been ordered to begin an insulin infusion. Other than glucose, what lab factor should the nurse pay particular attention to?
How can shapes be remembered for different bacteria?